254 research outputs found

    Reliability standards for the operation and planning of future electricity networks

    Get PDF
    Electricity networks, designed and operated in accordance with the historic deterministic standards, have broadly delivered secure and reliable supplies to customers. A key issue regarding their evolution is how the operation and planning standards should evolve to make efficient use of the existing assets while taking advantage of emerging, non-network (or non-wires) technologies. Deployment of the smart grid will require fundamental changes in the historical principles used for network security in order to ensure that integration of low-carbon generation is undertaken as efficiently as possible through the use of new information and communication technology (ICT), and new flexible network technologies that can maximize utilization of existing electricity infrastructure. These new technologies could reduce network redundancy in providing security of supply by enabling the application of a range of advanced, technically effective, and economically efficient corrective (or post-fault) actions that can release latent network capacity of the existing system. In this context, this paper demonstrates that historical deterministic practices and standards, mostly developed in the 1950s, should be reviewed in order to take full advantage of new emerging technologies and facilitate transition to a smart grid paradigm. This paper also demonstrates that a probabilistic approach to developing future efficient operating and design strategies enabled by new technologies, will appropriately balance network investment against non-network solutions while truly recognizing effects of adverse weather, common-mode failures, high-impact low-probability events, changing market prices for pre- and post-contingency actions, equipment malfunctioning, etc. This clearly requires explicit consideration of the likelihood of various outages (beyond those considered in deterministic studies) and quantification of their impacts on alternative network operation and investment decisions, which cannot be undertaken in a deterministic, “one size fits all” framework. In this context, we developed advanced optimization models aimed at determining operational and design network decisions based on both deterministic and probabilistic security principles. The proposed models can recognize network constraints/congestion and various operational measures (enabled by new technologies) composed of preventive and corrective control actions such as operation of special protection schemes, demand side response and generation reserve utilization and commitment, considering potential outages of network and generation facilities. The probabilistic model proposed can also provide targeted levels of reliability and limit exposure to severe low probability events (mainly driven by natural hazards) through the use of Conditional Value at Risk (CVaR) constraints, delivering robust and resilient supplies to consumers at the minimum cost. Through various case studies conducted on the Great Britain (GB) power network, we set out the key questions that need to be addressed in support of the change in network reliability paradigm, provide an overview of the key modelling approaches proposed for assessing the risk profile of operation of future networks, propose a framework for a fundamental review of the existing network security standards, and set out challenges for assessing the reliability and economics of the operation of future electricity network

    Residential electricity pricing in China

    Get PDF
    The paper aims to evaluate the implications of the new residential pricing system in China by examining price and income elasticity of demand by different household types. We use pre-reform annual panel data for 29 provinces over a fourteen year period, from 1998 to 2011, applying feasible generalize least squares models. The price and income elasticities for household sector are -0.412, and 1.476 at nation level, -0.300 and 1.550 in urban areas and -0.522 and 1.093 in rural areas respectively. With regional effects, the price and income elasticities are -0.146 and 1.286 for urban households in coastal provinces and -0.772 and 1.259 for urban households in inland provinces respectively. The empirical results reveal that there is important heterogeneity in the responsiveness to electricity price changes according to household income level and location

    EnAPlug – An Environmental Awareness Plug to Test Energy Management Solutions for Households

    Get PDF
    The present paper presents a new kind of Smart Plug that covers the needs of power systems R&D centers. EnAPlug, described in this paper, enables the monitor and control of loads, as a normal Smart Plug. However, it has a great benefit in comparison with a normal Smart Plug, the EnAPlug allows the integration of a variety of sensors so the user can understand the load and the surrounding environment (using a set of sensors that better fit the load). The sensors are installed in the load itself, and must have a clear fit to the load. The paper presents a demonstration of an EnAPlug used in a refrigerator for a demand response event participation, using the sensor capability to measure important values, such as, inside temperature.The present work has been developed under the EUREKA - ITEA2 Project M2MGrids (ITEA-13011), Project SIMOCE (ANI|P2020 17690), and has received funding from FEDER Funds through COMPETE program and from National Funds through FCT under the project UID/EEA/00760/2013 and SFRH/BD/109248/2015.info:eu-repo/semantics/publishedVersio

    Participation of wind power producers in intra-day markets : a case-study

    Get PDF
    ABSTRACT: The evolution of renewable energy has increased substantially over the past decade. Wind power producers (WPPs) can submit bids to energy markets, making short-term commitments to produce specific quantities of energy. This article presents a case-study to analyze the benefits of the active participation of wind power producers in energy markets, particularly intra-day markets. The case-study is carried out with the help of the MATREM system. The preliminary results indicate a reduction of the deviations of WPPs, but also a decreasing in their remuneration. Thus, the results highlight to some extent the importance of new market mechanisms to enable the active participation of WPPs in markets, without support policies.info:eu-repo/semantics/publishedVersio

    A Swing-Contract Market Design for Flexible Service Provision in Electric Power Systems

    Get PDF
    The need for flexible service provision in electric power systems has dramatically increased due to the growing penetration of variable energy resources, as has the need to ensure fair access and compensation for this provision. A swing contract (SC) facilitates flexible service provision because it permits multiple service attributes to be offered together in bundled form with each attribute expressed as a range of possible values rather than as a single point value. This paper discusses a new SC Market Design for electric power systems that permits SCs to be offered by any dispatchable resource. An analytical optimization formulation is developed for the clearing of an SC day-ahead market that can be implemented using any standard mixed integer linear programming (MILP) solver. The practical feasibility of the optimization formulation is demonstrated by means of a numerical example

    Renewable energy support policy based on contracts for difference and bilateral negotiation

    Get PDF
    ABSTRACT: The European Union has been one of the major drivers of the development of renewable energy. The energy policies of most European countries have involved subsidized tariffs, such as the feed-in tariff in Portugal, the regulated tariff and the market price plus premium in Spain, and the Renewables Obligation in UK, that came into effect in 2002. Recently, UK has made some reforms and started to consider contracts for difference (CfDs) as a key element of the energy policy. This paper presents a support policy based on CfDs and bilateral negotiation. The first phase consists in a CfD auction and the second phase involves a bilateral negotiation between a Government and each of the selected investors. The paper also presents a case-study to analyze the potential benefits of the support policy. It was performed with the help of the MATREM system. The preliminary results indicate some advantages for the Government (and, in some cases, for the investors as well).info:eu-repo/semantics/publishedVersio

    Effects of Working Memory Load on Oscillatory Power in Human Intracranial EEG

    Get PDF
    Studies of working memory load effects on human EEG power have indicated divergent effects in different frequency bands. Although gamma power typically increases with load, the load dependency of the lower frequency theta and alpha bands is uncertain. We obtained intracranial electroencephalography measurements from 1453 electrode sites in 14 epilepsy patients performing a Sternberg task, in order to characterize the anatomical distribution of load-related changes across the frequency spectrum. Gamma power increases occurred throughout the brain, but were most common in the occipital lobe. In the theta and alpha bands, both increases and decreases were observed, but with different anatomical distributions. Increases in theta and alpha power were most prevalent in frontal midline cortex. Decreases were most commonly observed in occipital cortex, colocalized with increases in the gamma range, but were also detected in lateral frontal and parietal regions. Spatial overlap with group functional magnetic resonance imaging results was minimal except in the precentral gyrus. These findings suggest that power in any given frequency band is not a unitary phenomenon; rather, reactivity in the same frequency band varies in different brain regions, and may relate to the engagement or inhibition of a given area in a cognitive task

    Performance of wide-area power system stabilizers during major system upsets: investigation and proposal of solutions

    Get PDF
    © 2021 Springer Nature Switzerland AG. This is a post-peer-review, pre-copyedit version of Benasla, M., Denaï, M., Liang, J. et al. Performance of wide-area power system stabilizers during major system upsets: investigation and proposal of solutions. Electr Eng (2021). The final authenticated version is available online https://doi.org/10.1007/s00202-020-01168-3Wide-area damping controllers (WADCs) are effective means of improving the damping of inter-area oscillations and thereby ensuring a secure operation of modern highly stressed interconnected power systems; however, their implementation costs are high. Therefore, the controller must be well configured and designed to ensure its cost-effectiveness. Several techniques have been proposed in the literature to design effective controllers and good results have been achieved. However, some important practical aspects that could potentially impact the performance of the designed controller have not been addressed or studied in sufficient detail in these previous works. One such aspect is assessing the performance of the designed controllers under major system upsets resulting in large deviations in the frequency and fluctuations in the power. These may lead to controller saturation which could negatively impact its damping performance or even cause instability. In this paper, the impact of such large upsets is investigated on several test systems via extensive small- and large-signal analyses and it is shown that, during severe transients, controller saturation may occur and persist over a long period of time, posing a potential threat to the power system stability. This paper presents a very effective solution to alleviate this problem and help design more robust WADCs. The simulation results show that the proposed solution works well and leads to improved power system stabilisers performance during transient upsets.Peer reviewedFinal Accepted Versio
    corecore