1,517 research outputs found
Recommended from our members
Built environment education and research in West Africa
Built environment programmes in West African universities; and research contributions from West Africa in six leading international journals and proceedings of the WABER conference are explored. At least 20 universities in the region offer degree programmes in Architecture (86% out of 23 universities); Building (57%); Civil Engineering (67%); Estate Management (52%); Quantity Surveying (52%); Surveying and Geoinformatics (55%); Urban and Regional Planning (67%). The lecturer-student ratio on programmes is around 1:25 compared to the 1:10 benchmark for excellence. Academics who teach on the programmes are clearly research active with some having published papers in leading international journals. There is, however, plenty of scope for improvement particularly at the highest international level. Out of more than 5000 papers published in six leading international peer-reviewed journals since each of them was established, only 23 of the papers have come from West Africa. The 23 papers are published by 28 academics based in 13 universities. Although some academics may publish their work in the plethora of journals that have proliferated in recent years, new generation researchers are encouraged to publish in more established journals. The analyses of 187 publications in the WABER conference proceedings revealed 18 research-active universities. Factors like quality of teaching, research and lecturer-student ratio, etc count in the ranking of universities. The findings lay bare some of the areas that should be addressed to improve the landscape of higher education in West Africa
Recommended from our members
Quality of tender documents: case studies from the UK
Tendering is one of the stages in construction procurement that requires extensive information and documents exchange. However, tender documents are not always clear in practice. The aim of this study was to ascertain the clarity and adequacy of tender documents used in practice. Access was negotiated into two UK construction firms and the whole tender process for two projects was shadowed for 6-7 weeks in each firm using an ethnographic approach. A significant amount of tender queries, amendments and addenda were recorded. This showed that quality of tender documentation is still a problem in construction despite the existence of standards like Co-ordinated Project Information (1987) and British Standard 1192 (1984 and 1990) that are meant to help in producing clear and consistent project information. Poor quality tender documents are a source of inaccurate estimates, claims and disputes on contracts. Six recommendations are presented to help in improving the quality of tender documentation. Further research is needed into the recommendations to help improve the quality of tender documents, perhaps in conjunction with an industry-wide investigation into the level of incorporation of CPI principles in practice
Recommended from our members
Health and safety on construction sites in Ghana
The state of health and safety on construction sites in Ghana was investigated using first hand observation of fourteen (14) construction project sites in 2009 and 2010. At each site, the construction project, workers and the physical environment of the site were inspected and evaluated against health and safety indicators taken from the literature. The results reveal a poor state of health and safety on Ghanaian construction sites. The primary reasons are a lack of strong institutional framework for
governing construction activities and poor enforcement of health and safety policies and procedures. Also, Ghanaian society does not place a high premium on health and safety of construction workers on site. Interviews with workers indicated that injuries and accidents are common on sites. However, compensation for injury is often at the discretion of the contractor although collective bargaining agreements between Labour unions and employers prescribe obligations for the contractor in the event of injury to a worker
Recommended from our members
Challenges and opportunities facing contractors in Ghana
The main aim of this study was to ascertain and discuss the current challenges and opportunities facing construction contractors in Ghana. This involved a review of the economic, legal and political environments in which contractors in Ghana operate; a review of published studies on construction in developing countries generally and Ghana specifically; and in-depth interviews and discussions with seven building and civil engineering contractors in Ghana in 2009 and 2010. Six road contractors were also interviewed. The findings indicate significant challenges relating mainly to financing for projects and a harsh business environment. However, most contractors interviewed admitted to significant problems in their own organisations. It is clear that the contracting environment in Ghana is harsh particularly for local contractors who are often not paid on time and without compensation for late payment. However, local construction firms in Ghana who want to breakthrough ought to formulate the right strategic plans, develop innovative business strategies, develop professionalism, and merge with local firms with similar organisational values and characteristics. In short, local or indigenous Ghanaian contractors ought to face up to the reality of competition and the dynamics of modern business in order to survive, grow and become major players in the construction industry in Ghana
Recommended from our members
An experimental approach to project risk identification and prioritization
One of the aims of a broad ethnographic study into how the apportionment of risk influences pricing levels of contactors was to ascertain the significant risks affecting contractors in Ghana, and their impact on prices. To do this, in the context of contractors, the difference between expected and realized return on a project is the key dependent variable examined using documentary analyses and semi-structured interviews. Most work in this has focused on identifying and prioritising risks using relative importance indices generated from the analysis of questionnaire survey responses. However, this approach may be argued to constitute perceptions rather than direct measures of the project risk. Here, instead, project risk is investigated by examining two measures of the same quantity; one ‘before’ and one ‘after’ construction of a project has taken place. Risks events are identified by ascertaining the independent variables causing deviations between expected and actual rates of return. Risk impact is then measured by ascertaining additions or reductions to expected costs due to the occurrence of risk events. So far, data from eight substantially complete building projects indicates that consultants’ inefficiency, payment delays, subcontractor-related problems and changes in macroeconomic factors are significant risks affecting contractors in Ghana
Recommended from our members
The evolution of indigenous contractors in Ghana
This paper provides some preliminary insights into the emergence and development of indigenous general contractors in Ghana. General contracting is the means by which an individual or organisation takes responsibility for supplying all of the materials, labour, equipment and services necessary for the construction of a project. Whereas the development of general contracting in places like the UK is well documented, the evolution of contractors in Ghana is not clearly articulated in the literature. Therefore, the main question in this paper is: How did indigenous contractors evolve in Ghana? To examine and analyze the research question, a literature review on similar developments elsewhere was first carried out. This was followed by discussions and unstructured interviews with experienced construction practitioners in Ghana most of whom were Quantity Surveyors. Most interviewees narrated their knowledge of contractor development in Ghana dating back to around 1945. From the explanations given, it was possible to develop a general understanding of the research question and to make a qualitative interpretation of the respondents’ comments and to draw some conclusions. General contractors emerged rapidly in the Gold Coast (now Ghana) shortly after World War II. Most were Italian master craftsmen in Ghana who were capitalized by the British colonial government to develop infrastructure in the Gold Coast following devastating effects of the war. Some of the indigenous people learned from the Italians and also established construction firms. Thus, general contracting in Ghana has a relatively short history in comparison to countries like Britain where the profession developed rapidly in the early part of the 19th century in response to the industrial revolution. Although they may possess sufficient technical expertise, many indigenous contractors in Ghana today lack the capacity to carry out major projects because of low capitalization and poor organisational structures. The current construction market in Ghana is dominated by foreign contractors. To become major players in the market, indigenous Ghanaian contractors should build strong organisational structures and pursue mergers and joint venturing to boost their financial, technical and managerial capacity
Recommended from our members
Risk and price in the bidding process of contractors
Formal and analytical risk models prescribe how risk should be incorporated in construction bids. However, the actual process of how contractors and their clients negotiate and agree on price is complex, and not clearly articulated in the literature. Using participant observation, the entire tender process was shadowed in two leading UK construction firms. This was compared to propositions in analytical models and significant differences were found. 670 hours of work observed in both firms revealed three stages of the bidding process. Bidding activities were categorized and their extent estimated as deskwork (32%), calculations (19%), meetings (14%), documents (13%), off-days (11%), conversations (7%), correspondence (3%) and travel (1%). Risk allowances of 1-2% were priced in some bids and three tiers of risk apportionment in bids were identified. However, priced risks may sometimes be excluded from the final bidding price to enhance competitiveness. Thus, although risk apportionment affects a contractor’s pricing strategy, other complex, microeconomic factors also affect price. Instead of pricing in contingencies, risk was priced mostly through contractual rather than price mechanisms, to reflect commercial imperatives. The findings explain why some assumptions underpinning analytical models may not be sustainable in practice and why what actually happens in practice is important for those who seek to model the pricing of construction bids
Recommended from our members
The tendering process and performance analysis of a public building project in Ghana
A case study on the tendering process and cost/time performance of a public building project in Ghana is conducted. Competitive bids submitted by five contractors for the project, in which contractors were required to prepare their own quantities, were analyzed to compare differences in their pricing levels and risk/requirement perceptions. Queries sent to the consultants at the tender stage were also analyzed to identify the significant areas of concern to contractors in relation to the tender documentation. The five bidding prices were significantly different. The queries submitted for clarifications were significantly different, although a few were similar. Using a before-and-after experiment, the expected cost/time estimate at the start of the project was compared to the actual cost/time values, i.e. what happened in the actual construction phase. The analysis showed that the project exceeded its expected cost by 18% and its planned time by 210%. Variations and inadequate design were the major reasons. Following an exploration of these issues, an alternative tendering mechanism is recommended to clients. A shift away from the conventional approach of awarding work based on price, and serious consideration of alternative procurement routes can help clients in Ghana obtain better value for money on their projects
Recommended from our members
Risk pricing practices in finance, insurance and construction
A review of current risk pricing practices in the financial, insurance and construction sectors is conducted through a comprehensive literature review. The purpose was to inform a study on risk and price in the tendering processes of contractors: specifically, how contractors take account of risk when they are calculating their bids for construction work. The reference to mainstream literature was in view of construction management research as a field of application rather than a fundamental academic discipline. Analytical models are used for risk pricing in the financial sector. Certain mathematical laws and principles of insurance are used to price risk in the insurance sector. construction contractors and practitioners are described to traditionally price allowances for project risk using mechanisms such as intuition and experience. Project risk analysis models have proliferated in recent years. However, they are rarely used because of problems practitioners face when confronted with them. A discussion of practices across the three sectors shows that the construction industry does not approach risk according to the sophisticated mechanisms of the two other sectors. This is not a poor situation in itself. However, knowledge transfer from finance and insurance can help construction practitioners. But also, formal risk models for contractors should be informed by the commercial exigencies and unique characteristics of the construction sector
- …