An efficient algorithm for minimizing earliness, tardiness, and due-date costs for equal-sized jobs
Department of Logistics2008-2009 > Academic research: refereed > Publication in refereed journalAccepted ManuscriptPublishe
Combining time and position dependent effects on a single machine subject to rate-modifying activities
We introduce a general model for single machine scheduling problems, in which the actual processing times of jobs are subject to a combination of positional and time-dependent effects, that are job-independent but additionally depend on certain activities that modify the processing rate of the machine, such as, maintenance. We focus on minimizing two classical objectives: the makespan and the sum of the completion times. The traditional classification accepted in this area of scheduling is based on the distinction between the learning and deterioration effects on one hand, and between the positional effects and the start-time dependent effects on the other hand. Our results show that in the framework of the introduced model such a classification is not necessary, as long as the effects are job-independent. The model introduced in this paper covers most of the previously known models. The solution algorithms are developed within the same general framework and their running times are no worse than those available earlier for problems with less general effects
Hybrid Genetic Bees Algorithm applied to Single Machine Scheduling with Earliness and Tardiness Penalties
This paper presents a hybrid Genetic-Bees Algorithm based optimised solution for the single machine scheduling problem. The enhancement of the Bees Algorithm (BA) is conducted using the Genetic Algorithm's (GA's) operators during the global search stage. The proposed enhancement aims to increase the global search capability of the BA gradually with new additions. Although the BA has very successful implementations on various type of optimisation problems, it has found that the algorithm suffers from weak global search ability which increases the computational complexities on NP-hard type optimisation problems e.g. combinatorial/permutational type optimisation problems. This weakness occurs due to using a simple global random search operation during the search process. To reinforce the global search process in the BA, the proposed enhancement is utilised to increase exploration capability by expanding the number of fittest solutions through the genetical variations of promising solutions. The hybridisation process is realised by including two strategies into the basic BA, named as â\u80\u9creinforced global searchâ\u80\u9d and â\u80\u9cjumping functionâ\u80\u9d strategies. The reinforced global search strategy is the first stage of the hybridisation process and contains the mutation operator of the GA. The second strategy, jumping function strategy, consists of four GA operators as single point crossover, multipoint crossover, mutation and randomisation. To demonstrate the strength of the proposed solution, several experiments were carried out on 280 well-known single machine benchmark instances, and the results are presented by comparing to other well-known heuristic algorithms. According to the experiments, the proposed enhancements provides better capability to basic BA to jump from local minima, and GBA performed better compared to BA in terms of convergence and the quality of results. The convergence time reduced about 60% with about 30% better results for highly constrained jobs
Refined conditions for V-shaped optimal sequencing on a single machine to minimize total completion time under combined effects
We address single machine scheduling problems for which the actual processing times of jobs are subject to various effects, including a positional effect, a cumulative effect and their combination. We review the known results on the problems to minimize the makespan, the sum of the completion times and their combinations and identify the problems for which an optimal sequence cannot be found by simple priority rules such as SPT (Shortest Processing Time) and/or LPT (Longest Processing Time). Typically, these are problems to minimize the sum of the completion times under a deterioration effect, and we verify under which conditions for these problems an optimal permutation is V-shaped (an LPT subsequence followed by an SPT subsequence). We demonstrate that previously used techniques for proving that an optimal sequence is V- shaped are not properly justified. We use the corrected method to describe a wide range of problems with a pure positional effect and a combination of a cumulative effect with a positional effect for which an optimal sequence is V-shaped. On other hand, we show that even the refined approach has its limitations
Cyclic scheduling of perishable products in parallel machine with release dates, due dates and deadlines
This paper deals with a realistic cyclic scheduling problem in the food industry environment in which
parallel machines are considered to process perishable jobs with given release dates, due dates and
deadlines. Jobs are subject to post-production shelf life limitation and must be delivered to retailers
during the corresponding time window bounded by due dates and deadlines. Both early and tardy jobs
are penalized by partial weighted earliness/tardiness functions and the overall problem is to provide
a cyclic schedule of minimum cost. A mixed integer programming model is proposed and a heuristic
solution beside an iterated greedy algorithm is developed to generate good and feasible solutions for the
problem. The proposed MIP, heuristic and iterated greedy produce a series of solutions covering a wide
range of cases from slow optimal solutions to quick and approximated schedules.Ruben Ruiz is partially supported by the Spanish Ministry of Economy and Competitiveness, under the project "RESULT - Realistic Extended Scheduling Using Light Techniques" with reference DPI2012-36243-C02-01 co-financed by the European Union and FEDER funds and by the Universitat Politecnica de Valencia, for the project MRPIV with reference PAID/2012/202.Shirvani, N.; Ruiz García, R.; Shadrokh, S. (2014). Cyclic scheduling of perishable products in parallel machine with release dates, due dates and deadlines. International Journal of Production Economics. 156:1-12. https://doi.org/10.1016/j.ijpe.2014.04.013S11215
Influence of maintenance policies on multi-stage manufacturing systems in dynamic conditions
- …