5,295 research outputs found
High-Energy X-ray Radiation Registration Model
It is proved the necessity for carrying out computing experiments according to the mean value and the square of registered X-ray photons absorbed energy of in a scintillation detector. The offered imitation model of the transfer and registration of high-energy X-ray radiation in a sensing volume of CsI and CdWO[4] scintillation detectors is based on a Monte Carlo method. The model considers leakage of secondary photons and electrons. It is offered approaches to justification of adequacy of the developed model of a high-energy X-ray radiation registration
Assessment of the Size of Rocks in Benchs and Lumpiness of the Blasted Mountain Mass on Pits with Use of Gis Geomix
On the basis of natural researches in career of SC Kovdorsky MCP and computer processing of their results in GIS GEOMIX was developed the photometric method of assessment of blocks (sizes) of breeds in the slope of ledges of a pit, the existing version of this method intended for assessment of lumpiness of mountain mass is improve
Strong short-range magnetic order in a frustrated FCC lattice and its possible role in the iron structural transformation
We investigate magnetic properties of a frustrated Heisenberg antiferromagnet
with a face-centered cubic (FCC) lattice and exchange interactions between the
nearest- and next-nearest neighbours, J1 and J2. In a collinear phase with the
wave vector Q = (pi,pi,pi) the equations of the self-consistent spin-wave
theory for the sublattice magnetization and the average short range order
parameter are obtained and numerically solved. The dependence of the Neel
temperature T_N on the ratio J2/J1 is obtained. It is shown, that at strong
enough frustration there is a wide temperature region above T_N with strong
short range magnetic order. Application of this result to description of
structural phase transition between alpha and gamma-phase of Fe is considered
Распределение остаточных напряжений в крутильных кольцах
Запропоновано метод вимірювання залишкових напружень, заснований на визначенні неелектричних величин електричними методами. Досліджено залежність розподілу залишкових напружень від типу метрологічної схеми, положення і розміру досліджуваної ділянки, довжини жорсткого подовжувача. На підставі одержаних результатів зроблені висновки про керування впливом технологічних залишкових напружень на експлуатаційні параметри виробів.The method of measuring of remaining tensions is offered, based on determination of analectic sizes electric methods. Dependence of distributing of remaining tensions is probed on the type of the utilized chart, length of the hard extending, position of the probed area. On the basis of results conclusions are done about influence of technological remaining tensions on operating properties of details.Предложен метод измерения остаточных напряжений, основанный на определении неэлектрических величин электрическими методами. Исследована зависимость распределения остаточных напряжений от типа метрологической схемы, положения и размера исследуемого участка, длины жесткого удлинителя. На основе полученных результатов сделаны выводы об управлении влиянием технологических остаточных напряжений на эксплуатационные параметры изделий
Вдосконалення технологічних рішень зведення великопрогонових покриттів підйомними модулями
After studying the organization and technological aspects of existing solutions for lifting large-span coatings through pulling and pushing, a new technological approach for erecting coatings using lifting modules was developed. According to the developed solution, first, by methods of free lifting using self-propelled boom cranes, twin columns of the frame, inter-column beams and bundles are mounted. On the foundations between the paired columns are placed lifting modules, which consist of hydraulic jacks and lifting platforms. Installation column heads are installed on lifting platforms. The external surfaces of carcass columns are secured with lifting retainers that are made of cantilevered support platforms, hydraulic cylinders, and movable crossbars. On low scaffolding, structural and technological blocks of coatings are increased. At that bearing crossbars of coatings are introduced into space between paired columns of frame and lowered onto heads of mounting columns. At the second stage of installation works by method of pushing out the coating is moved to the design height provided that supporting crossbars of the coating are supported on the heads of growing installation columns. In the process of growing the sections of the installation columns, the load from the raised coating and sections of the installation columns is alternately transferred to the hydraulic jacks of the lifting modules and the girders of the lifting locks. According to the developed solution, all the processes of growing the sections of installation columns and moving the roof girders from the foundation level to the level of the heads of the frame columns are automated Work on the construction of coatings can be performed in conditions of dense buildings on the site, the size of which does not exceed the overall dimensions of the rising coating. The volumes of high-altitude works have been reduced to operations for fixing the bearing crossbars of the coatings between the heads of the paired columns of the frame, which allows to significantly reduce the total time of lifting works.На закладі аналізу організаційно-технологічних особливостей відомих варіантів підйому великопрогонових покриттів методами підтягування та виштовхування було розроблене нове технологічне рішення зведення покриттів з використанням підйомних модулів. Згідно з розробленим рішенням, спочатку методами вільного підйому з використанням самохідних стрілових кранів монтують спарені колони рамного каркасу, міжколонні балки та зв’язки. На фундаментах між спареними колонами розміщують підйомні модулі, які складаються з гідравлічних домкратів та підйомних площадок. На підйомних площадках встановлюють оголовки монтажних колон. На зовнішніх поверхнях колон каркасу закріплюють фіксатори підйому, які складаються з консольних опорних площадок, гідроциліндрів та пересувних ригелів. На низьких риштуваннях укрупнюють конструктивно-технологічні блоки покриттів. При цьому несучи ригелі покриттів заводять в простір між спареними колонами каркасу і опускають на оголовки монтажних колон. На другому етапі монтажних робіт методом виштовхування переміщують покриття на проектну висоту за умови спирання опорних ригелів покриття на оголовки підрощувальних монтажних колон. В процесі підрощування секцій монтажних колон навантаження від піднімаємого покриття та секцій монтажних колон почергово передається на гідравлічні домкрати підйомних модулів та ригелі фіксаторів підйому. Згідно з розробленим рішенням всі процеси підрощування секцій монтажних колон та переміщення ригелів покриттів з рівня фундаментів до рівня оголовків колон каркасу автоматизовані. Роботи по зведенню покриттів можуть бути виконані в умовах щільної забудови на ділянці, розміри якої не перевищують габаритні розміри покриття, що піднімається. Об’єми висотних робіт скорочені до операцій по закріпленню несучих ригелів покриттів між оголовками спарених колон каркасу, що дозволяє суттєво скоротити загальні строки підйомних робіт
Measurement of shower development and its Moli\`ere radius with a four-plane LumiCal test set-up
A prototype of a luminometer, designed for a future e+e- collider detector,
and consisting at present of a four-plane module, was tested in the CERN PS
accelerator T9 beam. The objective of this beam test was to demonstrate a
multi-plane tungsten/silicon operation, to study the development of the
electromagnetic shower and to compare it with MC simulations. The Moli\`ere
radius has been determined to be 24.0 +/- 0.6 (stat.) +/- 1.5 (syst.) mm using
a parametrization of the shower shape. Very good agreement was found between
data and a detailed Geant4 simulation.Comment: Paper published in Eur. Phys. J., includes 25 figures and 3 Table
- …
