415 research outputs found
A Product Formula for the Normalized Volume of Free Sums of Lattice Polytopes
The free sum is a basic geometric operation among convex polytopes. This note
focuses on the relationship between the normalized volume of the free sum and
that of the summands. In particular, we show that the normalized volume of the
free sum of full dimensional polytopes is precisely the product of the
normalized volumes of the summands.Comment: Published in the proceedings of 2017 Southern Regional Algebra
Conferenc
On positivity of Ehrhart polynomials
Ehrhart discovered that the function that counts the number of lattice points
in dilations of an integral polytope is a polynomial. We call the coefficients
of this polynomial Ehrhart coefficients, and say a polytope is Ehrhart positive
if all Ehrhart coefficients are positive (which is not true for all integral
polytopes). The main purpose of this article is to survey interesting families
of polytopes that are known to be Ehrhart positive and discuss the reasons from
which their Ehrhart positivity follows. We also include examples of polytopes
that have negative Ehrhart coefficients and polytopes that are conjectured to
be Ehrhart positive, as well as pose a few relevant questions.Comment: 40 pages, 7 figures. To appear in in Recent Trends in Algebraic
Combinatorics, a volume of the Association for Women in Mathematics Series,
Springer International Publishin
Recommended from our members
An application of performance goal based method for the design and evaluation of structures
This paper describes an application of the U.S. Department of Energy`s (DOE) performance goal based method for the design and evaluation of structures, systems, and components (SSCS) at Fluor Daniel Hanford, Inc. (FDH). The philosophy on which DOE`s method is based has been employed to construct a graded approach to the minimum structural design and evaluation criteriz@ used at the DOE Hanford Site that complies with the DOE Order 54E;0.28, Natural Phenomena Hazards Mitigation. The FDH structural design and evaluation criteria applies to both nuclear and non-nuclear SSCs that are not covered by a reactor safety analysis report
Recommended from our members
Project management plan, double-shell tank system specification development
The Project Hanford Management Contract (PHMC) members have been tasked by the US Department of Energy (DOE) to support removal of wastes from the Hanford Site 200 Area tanks in two phases. The schedule for these phases allows focusing on requirements for the first phase of providing feed to the privatized vitrification plants. The Tank Waste Retrieval Division near-term goal is to focus on the activities to support Phase 1. These include developing an integrated (technical, schedule, and cost) baseline and, with regard to private contractors, establishing interface agreements, constructing infrastructure systems, retrieving and delivering waste feed, and accepting immobilized waste products for interim onsite storage. This document describes the process for developing an approach to designing a system for retrieving waste from double-shell tanks. It includes a schedule and cost account for the work breakdown structure task
Recommended from our members
US Department of Energy natural phenomena design/evaluation guidelines/lessons learned
In the spring of 1988, DOE Order 6430.1A, General Design Criteria (1), was issued for use. This document references UCRL-15910, Design and Evaluation Guidelines for DOE Facilities Subjected to Natural Phenomena Hazards (2), which is to be used as the basis for the design and evaluation of new and existing facilities to natural phenomena loading. Rather than use the historical deterministic methods for computing structural and component loading from potential natural phenomena, UCRL-15910 incorporated the years of hazards studies conducted throughout the US Department of Energy complex into probabilistic-based methods. This paper describes the process used to incorporate US Department of Energy natural phenomena design guidelines into the Hanford Plant Standards -- Standard Design Criteria for Architectural and Civil Standards (3). It also addresses the subsequent use of these criteria during structural assessments of facilities, systems, and components of various vintage in support of updating safety analysis reports. The paper includes comparison of results using these most recent probabilistic-based natural phenomena loading criteria to those obtained from previous assessments, and it addresses the lessons learned from the many structural evaluations of 1940--1960 vintage buildings
Recommended from our members
DOE Order 5480.28, Natural phenomena hazards mitigation system, structure, component database
This document describes the Prioritization Phase Database that was prepared for the Project Hanford Management Contractors to support the implementation of DOE Order 5480.28. Included within this document are three appendices which contain the prioritized list of applicable Project Hanford Management Contractors Systems, Structures, and Components. These appendices include those assets that comply with the requirements of DOE Order 5480.28, assets for which a waiver will be recommended, and assets requiring additional information before compliance can be ascertained
Recommended from our members
Fluor Daniel Hanford implementation plan for DOE Order 5480.28, Natural phenomena hazards mitigation
Natural phenomena hazards (NPH) are unexpected acts of nature that pose a threat or danger to workers, the public, or the environment. Earthquakes, extreme winds (hurricane and tornado), snow, flooding, volcanic ashfall, and lightning strikes are examples of NPH that could occur at the Hanford Site. U.S. Department of Energy (DOE) policy requires facilities to be designed, constructed, and operated in a manner that protects workers, the public, and the environment from hazards caused by natural phenomena. DOE Order 5480.28, Natural Phenomena Hazards Mitigation, includes rigorous new natural phenomena criteria for the design of new DOE facilities, as well as for the evaluation and, if necessary, upgrade of existing DOE facilities. The Order was transmitted to Westinghouse Hanford Company in 1993 for compliance and is also identified in the Project Hanford Management Contract, Section J, Appendix C. Criteria and requirements of DOE Order 5480.28 are included in five standards, the last of which, DOE-STD-1023, was released in fiscal year 1996. Because the Order was released before all of its required standards were released, enforcement of the Order was waived pending release of the last standard and determination of an in-force date by DOE Richland Operations Office (DOE-RL). Agreement also was reached between the Management and Operations Contractor and DOE-RL that the Order would become enforceable for new structures, systems, and components (SSCS) 60 days following issue of a new order-based design criteria in HNF-PRO-97, Engineering Design and Evaluation. The order also requires that commitments addressing existing SSCs be included in an implementation plan that is to be issued 1 year following the release of the last standard. Subsequently, WHC-SP-1175, Westinghouse Hanford Company Implementation Plan for DOE Order 5480.28, Natural Phenomena Hazards Mitigation, Rev. 0, was issued in November 1996, and this document, HNF-SP-1175, Fluor Daniel Hanford Implementation Plan for DOE Order 5480.28, Natural Phenomena Hazards Mitigation, is Rev. 1 of that plan
Development of Decision Support Systems for Estimating Salinity Instrusion Effects due to Climate Change on the South Carolina and Georgia Coast
2010 S.C. Water Resources Conference - Science and Policy Challenges for a Sustainable Futur
Development of a Mercury Load Model for McTier Creek, South Carolina Using TOPMODEL
2012 S.C. Water Resources Conference - Exploring Opportunities for Collaborative Water Research, Policy and Managemen
- …
