140 research outputs found
Progress in crystal extraction and collimation
Recent IHEP Protvino experiments show efficiencies of crystal-assisted slow
extraction and collimation of 85.3+-2.8%, at the intensities of the channeled
beam on the order of 10^12 proton per spill of 2 s duration. The obtained
experimental data well follows the theory predictions. We compare the
measurements against theory and outline the theoretical potential for further
improvement in the efficiency of the technique. This success is important for
the efficient use of IHEP accelerator and for implementation of
crystal-assisted collimation at RHIC and slow extraction from AGS onto E952,
now in preparation. Future applications, spanning in the energy from order of 1
GeV (scraping in SNS, slow extraction from COSY and medical accelerators) to
order of 1 TeV and beyond (scraping in Tevatron, LHC, VLHC), can benefit from
these studies.Comment: 7pp. Presented at HEACC 2001 (Tsukuba, March 25-30
The Investigations Of Beam Extraction And Collimation At U-70 Proton Synchrotron Of IHEP By Using Short Silicon Crystals
The new results of using short (2-4mm) bent crystals for extraction and
collimation of proton beam at IHEP 70 Gev proton synchrotron are reported. A
broad range of energies from 6 to 65 GeV has been studied in the same crystal
collimation set-up. The efficiency of extraction more than 85% and intensity
more than 10E12 were obtained by using crystal with the length 2-mm and the
angle 1 mrad. The new regime of extraction is applied now at the accelerator to
deliver the beam for different experimental setups within the range of
intensity 10E7-10E12ppp.Comment: Presented at EPAC 2002 (Paris, June 3-7), 3p
Muon Colliders
Muon Colliders have unique technical and physics advantages and disadvantages
when compared with both hadron and electron machines. They should thus be
regarded as complementary. Parameters are given of 4 TeV and 0.5 TeV high
luminosity \mumu colliders, and of a 0.5 TeV lower luminosity demonstration
machine. We discuss the various systems in such muon colliders, starting from
the proton accelerator needed to generate the muons and proceeding through muon
cooling, acceleration and storage in a collider ring. Problems of detector
background are also discussed.Comment: 28 pages, with 12 postscript figures. To be published Proceedings of
the 9th Advanced ICFA Beam Dynamics Workshop, AIP Pres
High-efficiency beam extraction and collimation using channeling in very short bent crystals
silicon crystal was used to channel and extract 70 GeV protons from the U-70 accelerator with an efficiency of 85.3±2.8%, as measured for a beam of ∼1012 protons directed towards crystals of ∼2 mm length in spills of ∼2 s duration. The experimental data follow very well the prediction of Monte Carlo simulations. This demonstration is important in devising a more efficient use of the U-70 accelerator in Protvino and provides crucial support for implementing crystal-assisted slow extraction and collimation in other machines, such as the Tevatron, RHIC, the AGS, the SNS, COSY, and the LHC
Recommended from our members
Modification of the horizontal dispersion in the Fermilab Main Ring with additional quadrupoles
In the normal Main Ring lattice, the horizontal dispersion includes a dispersion wave'' which peaks at 6.2 meters because the horizontal dispersion of the arcs is not matched into the straight sections. Six additional small quadrupoles have been installed, one in each sector, and powered at low energies (up to 30 GeV) in order to reduce the amplitude of the dispersion wave. The maxima of the dispersion function were thereby reduced to less than 4.7 meters, thus improving the momentum acceptance of the Main Ring. Measurements of the modified dispersion function agree well with the expected values. 3 refs., 5 figs
Status of Muon Collider Research and Development and Future Plans
The status of the research on muon colliders is discussed and plans are
outlined for future theoretical and experimental studies. Besides continued
work on the parameters of a 3-4 and 0.5 TeV center-of-mass (CoM) energy
collider, many studies are now concentrating on a machine near 0.1 TeV (CoM)
that could be a factory for the s-channel production of Higgs particles. We
discuss the research on the various components in such muon colliders, starting
from the proton accelerator needed to generate pions from a heavy-Z target and
proceeding through the phase rotation and decay ()
channel, muon cooling, acceleration, storage in a collider ring and the
collider detector. We also present theoretical and experimental R & D plans for
the next several years that should lead to a better understanding of the design
and feasibility issues for all of the components. This report is an update of
the progress on the R & D since the Feasibility Study of Muon Colliders
presented at the Snowmass'96 Workshop [R. B. Palmer, A. Sessler and A.
Tollestrup, Proceedings of the 1996 DPF/DPB Summer Study on High-Energy Physics
(Stanford Linear Accelerator Center, Menlo Park, CA, 1997)].Comment: 95 pages, 75 figures. Submitted to Physical Review Special Topics,
Accelerators and Beam
Muon Collider Design
Muon Colliders have unique technical and physics advantages and disadvantages
when compared with both hadron and electron machines. They should thus be
regarded as complementary. Parameters are given of 4 TeV and 0.5 TeV high
luminosity \mu^+ \mu^- colliders, and of a 0.5 TeV lower luminosity
demonstration machine. We discuss the various systems in such muon colliders,
starting from the proton accelerator needed to generate the muons and
proceeding through muon cooling, acceleration and storage in a collider ring.
Detector background, polarization, and nonstandard operating conditions are
discussed.Comment: 42 pages TeX file (aipproc style), 25 postscript figures. Submitted
to the Proceedings of the Symposium on Physics Potential and Development of
Colliders, San Francisco, CA Dec 13-15, 1995. Edited by D.
Cline and D. Sander
- …
